South West Queensland Pipeline Mainline Valve |
|
![]() |
Location |
Mainline Valve Site #2 southwest of Tarbat, South West Queensland |
Contract Value |
$220,000 |
|
Date Commenced |
August 2006 | |
Date Completed |
May 2007 | |
Services to Client |
Modification of existing valve station |
|
Remote
area modification of existing valve station to provide a metered off take to
supply Santos Limited with fuel gas for power generation at the Tarbat Oil
Field development.
New
spooling was fabricated and installed and connected into the existing mainline
valve. Instrumentation and electrics were installed and commissioned.
Some
months later Diversified returned to the site to install new meter tubing into
the meter skid.
This
project demonstrated Diversified’s ability to respond in a remote location to
the clients’ requirements in a timely and professional manner with minimal
disruption to existing operations. |